Henan Shenma Catalytic Technology New Materials Co., Ltd. Catalyst Preparation Base Construction Project Environmental Impact Assessment Public Announcement
Release time:
2022-04-15
According to the "the People's Republic of China Environmental Impact Assessment Law" and the "Interim Measures for Public Participation in Environmental Impact Assessment", with reference to the relevant provisions of the "Environmental Impact Assessment Public Participation Measures", the "Henan Shenma Catalytic Technology New Material Co., Ltd. Catalyst Preparation Base Construction Project" Environmental Impact Assessment information is announced as follows
AccordingThe "the People's Republic of China Environmental Impact Assessment Law" and the "Interim Measures for Public Participation in Environmental Impact Assessment" refer to the relevant provisions in the "Measures for Public Participation in Environmental Impact Assessment".“Henan Shenma Catalytic Technology New Material Co., Ltd. Catalyst Preparation Base Construction Project”The environmental impact assessment information shall be publicized as follows:
Information on environmental impact assessment of 1. projects
1Project Overview
Project Name:Henan Shenma Catalytic Technology New Material Co., Ltd. Catalyst Preparation Base Construction Project
Construction unit:Henan Shenma Catalytic Technology New Material Co., Ltd. Construction Address:Pingdingshan nylon new material industry cluster areaChemicalThree Road West
Project Overview:By investing in the first phase of the original catalyst production R & D center project.30878.67Ten thousand yuan, on the north side of the existing plant site, newly requisitioned land47567.48m2The construction of the catalyst preparation base construction project (hereinafter referred to as the project), the construction scale is annual output.10000tons of molecular sieve catalyst,150Tons of precious metal catalysts.
2Main environmental impacts and pollution prevention measures of the Project
(14) Exhaust gas
① 201Workshop production waste gas, dust-containing waste gas are proposed to be treated by dust collector, and then combined with the acidic waste gas in the workshop, led to the workshop supporting two-stage water washing+The two-stage alkali washing and treatment device passes through after treatment.DA010Exhaust tube discharge;② 202Workshop production exhaust gas is mainly dust-containing exhaust gas, respectively, after collection, the use of dust collector treatment, throughDA011Exhaust tube discharge;③ 203The exhaust particles and acid exhaust gas produced by the workshop, and the dust-containing exhaust gas are planned to be treated by a dust remover, and after being combined with the acid exhaust gas in the workshop, they will be led to the two-stage water washing in the workshop.+Three-stage alkaline washing+Absorption treatment unit after treatment throughDA012Exhaust tube discharge;③Heat conduction oil furnace exhaust gas, project heat conduction oil furnace adopts low nitrogen burner+After flue gas circulation measures, throughDA013Exhaust tube discharge;④Waste gas from sewage treatment stations, mainly malodorous gases such as ammonia and hydrogen sulfide, is set up through its supporting“biological trickling filter+activated carbon adsorption”After device processing, throughDA014Exhaust pipe emissions; the exhaust gas of this project can meet the relevant emission standards after adopting the above measures.
(21) Waste water
The condensed water produced by the high salinity wastewater after evaporation treatment in this project is all recycled for production and not discharged; after mixing the pretreated high ammonia nitrogen wastewater with low concentration wastewater, domestic sewage and ground cleaning wastewater, the treatment capacity after expansion is adopted.800m3/dThe sewage treatment station is treated and mixed with clean water and discharged through the main discharge port of the plant.After the completion of the project, the water quality of the drainage outside the plant can meet the requirements.Indirect Discharge Standard for Water Pollutants in Chemical Industry (DB41/1135-2016), Discharge Standard of Pollutants for Inorganic Chemical Industry (GB31573-20152) Indirect Discharge Concentration Limit of Water Pollutants and Inlet Water Quality Requirements of Pingdingshan No.3 Sewage Treatment Plant, can achieve the discharge standard.
(32) Solid waste
General solid waste is mainlyBag filterCollection of dust, household waste of workers and waste from pure water preparation deviceROMembrane. The bag filter collects dust and waste.ROMembrane, to the relevant units for treatment and disposal.
Hazardous solid wastes are mainly waste oil from equipment maintenance, waste activated carbon from sewage treatment waste gas treatment devices, sludge from sewage treatment stations, waste liquid from ruthenium tetroxide production processes andMVRsalts produced by evaporation systems; whereMVRThe nature of salts produced by the evaporation system is to be determined. The evaluation suggests that the construction unit shall temporarily manage the hazardous solid wastes and subsequently treat and dispose them according to relevant standards according to the actual identification results. The waste oil, waste activated carbon, sludge and ruthenium tetroxide production waste produced by this project shall be temporarily stored in the hazardous solid waste storage room and handed over to qualified units for treatment and disposal.
(41) Noise
This projectThe high-noise equipment mainly includes various pumps, Roots blowers, air compressors, etc.After adopting noise reduction measures such as sound insulation and vibration reduction, the high noise sources are controlled,It is predicted that the contribution value of each plant boundary can be satisfied.Emission Standard for Noise at Boundary of Industrial Enterprises (GB12348-2008)3Class standard requirements.
3Conclusion of Environmental Impact Assessment
This project is in line with the relevant industrial policies of the state and Henan Province; the pollution prevention and control measures taken are reasonable and feasible, and all pollutant indicators meet the discharge standards. From the perspective of environmental protection, the project construction is feasible.
Public Scope of 2. Consultation
Henan Shenma Catalytic Technology New Material Co., Ltd. Catalyst Preparation Base Construction ProjectAll members of the public within the scope of the EIA.
Ways and means of putting forward 3. opinions
During the publicity period, if you have any comments or suggestions, you can download the public opinion form to fill in, and directly feedback to the construction unit through the following contact information.
1, Public Opinion Form Link:https://pan.baidu.com/s/19GzcvCwUyCBv4qnCvmWAAw?pwd=wea4 Extraction code:wea4
22. Contact information of construction unit:
Unit Name:Henan Shenma Catalytic Technology New Material Co., Ltd.
groundAddress:Pingdingshan nylon new material industry cluster areaChemicalThree Road West
Contact:Mr. Wang Contact Phone:03752797592(18737511912) E-mail:chkjgs888@163.com
Start and end time of 4. public comments
From the date of publicity5Within working days, the public can put forward their opinions to the construction unit and the environmental impact assessment unit by telephone, letter or other reasonable means.
How to Obtain the Draft of 5. Environmental Impact Report
1, Electronic Report Link:https://pan.baidu.com/s/1SwB5pjeSJITY0Iw9TdrxMA?pwd=acnm Extraction code:acnm
2Access to paper reports:Pingdingshan nylon new material industry cluster areaChemicalHenan Shenma Catalytic Technology New Material Co., Ltd. on the west side of Sanlu Road
Information publicity unit:Henan Shenma Catalytic Technology New Material Co., Ltd.
Key words:
Related

Pay attention to the official WeChat public number
More wonderful waiting for you!
Company Address: 6th Floor, Building 23, 666 Gaoxin Torch Garden, East Section of Shenma Avenue, Pingdingshan City, Henan Province
TEL:+86 0375-7066729 +86 0375-7066726
E-MAIL:chkjgs888@163.com